Kidmat Afek and Afeka: two more projects in Rosh Ha'ayin, 96 units together
After the Buyer's Price project, the company delivered two more projects in Rosh Ha'ayin in two different typologies. Three projects in one city is a datum about local familiarity, not coincidence.

A developer delivering one project in a city climbs the learning curve. A developer delivering three climbs it once and profits from it twice.
In Rosh Ha'ayin the company has three projects, all completed: Buyer's Price (89 units in three clusters), Kidmat Afek (33 ground-attached units) and Afeka (two buildings, 63 units).
Kidmat Afek
The figures
- Location
- Pisgat Afek neighbourhood, Rosh Ha'ayin
- Housing units
- 33
- Typology
- Ground-attached
- Status
- Completed
Afeka
The figures
- Location
- Rosh Ha'ayin
- Buildings
- Two
- Housing units
- 63
- Average units per building
- About 31.5
- Status
- Completed
Three typologies in one city
| Project | Units | Typology |
|---|---|---|
| Rosh Ha'ayin, Buyer's Price | 89 | Three clusters of 3–4 floors |
| Kidmat Afek | 33 | Ground-attached |
| Afeka | 63 | Two buildings, high-density |
| Total | 185 | Three different typologies |
What the table shows is not only scale. It shows three different delivery mechanisms: a subsidised track with a tender and price ceilings, a ground-attached project where development is the main event, and high-density construction with large common property. Three different risk systems, within one local authority.
What it means for a buyer
A developer's familiarity with a particular local authority is not a marketing story; it is an operational asset. Infrastructure connections, the local planning committee's requirements, approval timelines and ground conditions are all learned on the first project and shortened by the third. It is the same logic behind the five projects in the Galil neighbourhood of Nazareth; see the article on the Galil neighbourhood.
Against that — local track record does not replace any of the checks. The security, the specification, the payment schedule and the handover date are examined as strictly on a third project as on a first. The list is in the article on the sale contract.
Ground-attached homes: what changes in the check
- Yard development is a central component, and an item with three inspection years.
- Waterproofing — four inspection years — matters especially in houses with a basement or a sunken yard.
- Limited common property — so each unit's share is large. See the article on common property and by-laws.
- Garden areas — recorded in Part A of the specification on a separate line, not inside the apartment's area. See the article on apartment area.
Questions and answers
How many units are at Kidmat Afek?
33 ground-attached housing units, in the Pisgat Afek neighbourhood of Rosh Ha'ayin.
And at Afeka?
63 housing units in two buildings.
How many projects does the company have in Rosh Ha'ayin?
Three — Buyer's Price (89 units), Kidmat Afek (33) and Afeka (63), 185 units in total.
What is distinctive about checking ground-attached homes?
Yard development (three inspection years) and waterproofing (four) are the central items, the common property is limited and each unit's share is large, and garden areas appear on a separate line in the specification.
What is the status of the two projects?
Both are completed.